Question 1
What is the main purpose of a feasibility study before a new system is installed?
Question 2
Which document is most useful for identifying what the new system should do before installation begins?
Question 3
What is one advantage of testing a system in parallel with the old system?
Question 4
Which changeover method replaces the old system with the new system all at once?
Question 5
Why is user training important during system installation?