Process Metrics — Quiz

Test your understanding of process metrics with 5 practice questions.

Read the lesson first

Practice Questions

Question 1

Which metric defines the capacity of a process after accounting for planned downtime and maintenance?

Question 2

A machine has a design capacity of 1200 units per day and is scheduled for planned maintenance 15% of the time. What is its effective capacity in units per day?

Question 3

Which metric measures the ratio of actual output to effective capacity, indicating how well available capacity is utilized?

Question 4

A production line has a design capacity of 500 units per day, planned downtime of 20%, and actual daily output of 360 units. What is the process efficiency?

Question 5

A process has three identical machines operating in parallel, each with a cycle time of 5 minutes per unit. Their outputs feed into a single downstream workstation with a cycle time of 10 minutes per unit. What is the maximum throughput of the entire process in units per hour?