4. Operations Analytics
Linear Programming — Quiz
Test your understanding of linear programming with 5 practice questions.
Practice Questions
Question 1
Which of the following equations correctly models the assembly time constraint for two products A and B if each unit of A requires 3 hours, each unit of B requires 2 hours, and a maximum of 180 hours of assembly time are available?
Question 2
In the constraint $4x + y + s = 100$, if at a feasible solution the slack variable $s$ equals 20, what does this indicate about resource utilization?
Question 3
Solve the LP: Maximize $Z = 7x + 4y$ subject to $2x + 3y \le 12$, $x + y \le 5$, $x, y \ge 0$. What is the optimal solution and optimal value of $Z$?
Question 4
In the simplex method for a maximization problem, a non-basic variable has a reduced cost $(c_j - z_j)$ of 5. What does this imply?
Question 5
During the simplex method, if all reduced costs $(c_j - z_j)$ for non-basic variables are non-positive, what condition has been met?